Environmental Screening ToolPlatform Knowledge Centre · Ghana
Institutional decision-support documentation

Understand the core public functions before using their evidence

This centre explains what each platform function does, what evidence it uses, what its result means and where human or institutional verification remains necessary.

Decision-support boundary: the platform does not issue an environmental permit, mining licence, land title, enforcement finding or proof of lawful gold origin. The responsible public institution retains every statutory decision.

Platform functions

Project screening

Evaluates a location or operational footprint against the environmental profile, regulatory pathway and project information supplied by the user.

Methodology and indicators →

ASM regularisation pre-screen

Tests a proposed artisanal and small-scale mining location or footprint for mapped conflicts and verification requirements before institutional review.

Read the ASM method →

Caseload screening

Processes multiple coordinates for prioritisation. It is rapid triage and does not replace full footprint screening for individual projects.

Officer procedure →

Galamsey Monitor

Ranks districts by unlicensed vegetation-loss pressure using the served v1.3 proxy model. It is not proof of illegal mining.

Monitor Knowledge Centre →

Encroachment Monitor

Flags mapped structures intersecting selected protected polygons for officer review. A flag is a lead, not an enforcement finding.

Limitations and workflow →

Officer Dashboard

Supports authorised case records, activity summaries, statutory clocks and administrative oversight according to assigned roles.

Officer operations →

Report reconciliation

Compares an existing scoping report with a fresh location screen and identifies agreements, omissions and matters requiring review.

Reconciliation method →

Evidence reports

Reports name mapped features where source data contain verified names, record distances and laws, and disclose unnamed or unavailable evidence.

Evidence and provenance →

Methodology and manual

The methodology is the technical source; the officer manual describes operational use. Both must remain aligned with the deployed engine.

Open technical reference →
Dedicated methodology

Artisanal and Small-Scale Mining Regularisation Pre-Screen

The ASM function is an environmental intake and prioritisation screen. It asks whether the submitted point or sampled operational footprint encounters mapped evidence that should stop, delay or condition entry into a formalisation review.

Accepted geometryMap click, decimal-degree coordinates, GPS position or a user-drawn polygon. A polygon is preferred because a pin cannot represent pits, plant, tailings, roads and ancillary areas.
Polygon processingThe backend samples the centroid, boundary and interior grid at up to 25 points and carries the worst relevant indicator status forward. This is screening-grade sampling, not an exact intersection against every national layer.
Project classificationThe request is sent as mining, mineral type “artisanal and small-scale gold mining,” and non-water-dependent. The latter prevents mining from being treated as an activity that must occupy a lake or river.
Checks presentedRiver and inland water, wetland, protected area, road reservation, settlement signal, institutional land, cultural heritage and urban drainage evidence.
Outcome logicA canonical refused decision or refusal trigger produces mapped no-go. Review flags, missing services or incomplete evidence produce verification required. Otherwise the result is no mapped conflict—not approval.
Evidence boundaryDistance is calculated against available source geometries. Curved rivers and irregular lakes are respected where the dataset supplies those shapes; generalised, missing or displaced features remain possible.

ASM assessment sequence

Validate jurisdiction. The selected point must lie within the Ghana screening polygon. Border locations require an authoritative survey.
Capture the operational area. Draw the complete footprint where possible; a point is suitable only for an early enquiry.
Run the canonical environmental screen. The ASM interface does not invent separate thresholds; it follows the backend verdict and refusal overrides.
Separate exclusion from verification. A statutory trigger may require assessment, clearance or field confirmation without creating an absolute prohibition.
Record feature, relationship and legal basis. Results identify the mapped feature where its source has a verified name, measured distance or containment, relevant law, authority and next action.
Route the evidence. Environmental pre-screening precedes licence and parcel validation, environmental pathway review and any responsible-sourcing or traceability linkage.

Interpretation matrix

Displayed outcomeMeaningPermitted useRequired next step
Mapped no-go conditionThe canonical screen returned a refusal decision or refusal trigger.Stop the automated pathway and preserve the evidence.Responsible authority resolves boundary, data or legal status before advancement.
Verification requiredNo conclusive refusal was established, but proximity, missing evidence or service failure prevents a clear result.Prioritise records, imagery and field verification.Obtain confirmation from the named custodian or authority.
No mapped conflictNo refusal trigger was found in the available layers at the sampled locations.Advance to institutional review only.Validate licence, parcel, environmental pathway and field conditions.
Screen unavailableA required service or jurisdiction check failed.No institutional conclusion may be drawn.Retain the coordinates and retry; do not interpret failure as clearance.

Known ASM limitations

Settlement evidence

Built-up or sealed-surface evidence is a screening signal. It cannot establish occupancy, community boundaries, schools or lawful land use without current imagery and field confirmation.

Water and buffers

Buffers follow the geometry present in the source and therefore follow bends and lake boundaries where those shapes are available. Missing tributaries, seasonal channels and generalised shorelines can cause false clearance.

Legal interpretation

The tool reports legal and institutional context but does not replace an authority’s interpretation of current law, gazetted boundaries, permits or exemptions.

Data currency

Every result must be read with its source, snapshot date, coverage and quality disclosure. “No mapped conflict” never means that an unmapped feature is absent.

Licensing and traceability

The environmental record is not a Minerals Commission licence and does not prove that gold originated from the screened site. It may support—not replace—responsible-sourcing due diligence.

Institutional validation

The proposed hand-off involves policy coordination, licence and parcel validation, environmental review, water and forest verification, geological suitability and responsible-sourcing linkage.

Technical implementation details, data-lineage tables and version history are maintained in the full methodology. Operational instructions are maintained in the officer manual.

Abbreviations and institutional names

Terms are written out at first use in standalone records. This quick reference prevents ambiguous institutional and technical abbreviations.

ASMArtisanal and Small-Scale Mining
EPAEnvironmental Protection Authority
EIAEnvironmental Impact Assessment
EISEnvironmental Impact Statement
EMPEnvironmental Management Plan
MMDAMetropolitan, Municipal and District Assembly
MLNRMinistry of Lands and Natural Resources
NAIMOSNational Anti-Illegal Mining Operations Secretariat
WRCWater Resources Commission
GGSAGhana Geological Survey Authority
GMMBGhana Museums and Monuments Board
REGSECRegional Security Council
GISGeographic Information System
GPSGlobal Positioning System
GADMDatabase of Global Administrative Areas
OSMOpenStreetMap
GHSLGlobal Human Settlement Layer
NDVINormalized Difference Vegetation Index
GeoJSONGeographic JavaScript Object Notation
SHA-256Secure Hash Algorithm 256-bit
L.I.Legislative Instrument
Important distinctions: IMCIM (Inter-Ministerial Committee on Illegal Mining) is historical and dissolved; it is not a current approval route. NAIMOS is the current operational body identified by MLNR. “GHA” is not used alone because it can mean Ghana Highway Authority or Ghana Hydrological Authority. “ESA” must be qualified as European Space Agency or Environmental Site Assessment.